Files
kandev/docs/plans/task-owned-plan-comments/plan.md
T

253 lines
13 KiB
Markdown

---
created: 2026-09-02
status: completed
requirements:
- REQ-TASKS-PLAN-COMMENTS-001
- REQ-TASKS-PLAN-COMMENTS-002
- REQ-TASKS-PLAN-COMMENTS-003
- REQ-TASKS-PLAN-COMMENTS-004
system_design:
- ../../specs/tasks/system-design/plan-comments.md
legacy_specs:
- ../../specs/ui/requirements/plan-comment-drafts.md
- ../../specs/ui/system-design/plan-comment-drafts.md
---
# Implementation Plan: Task-Owned Plan Comments
## Overview
Move pending plan comments from per-session `sessionStorage` into one
backend-owned collection for the task's current plan. First establish the
persisted CRUD and synchronization contract, then extend direct and queued
prompt admission to consume referenced comments atomically. After those server
boundaries exist, replace the frontend session projection, migrate legacy
browser drafts, and prove selected-session Send versus primary-session Run on
desktop and mobile.
The order prevents the UI from exposing a shared state that cannot yet survive
reload or guarantee its delivery semantics.
## Scope
### In scope
- Backend persistence, task authorization, optimistic versions, collection
revisions, and WebSocket snapshots for current-plan comments.
- One shared Plan annotation projection and composer context item across all
sessions in a task.
- Ordinary Send to the selected session and plan-comment Run to the current
primary session.
- Server-owned prompt formatting and atomic consumption with both direct and
queued acceptance.
- Safe one-time migration from session-scoped browser records.
- Desktop and phone behavior, localized errors, unit/integration tests,
Playwright coverage, and the existing public task guide.
### Out of scope
- Changing ownership of diff, file, pull-request, walkthrough, or agent-message
comments.
- Sent-comment history separate from the accepted transcript or queue row.
- Comments on historical plan revisions.
- Automatic prompt broadcast or ambient injection into every session.
- Redesigning the Plan editor, session tabs, or composer layout.
## Technical approach
### Persistence and synchronization
Add `models.TaskPlanComment` and `task_plan_comments`. Add
`comments_revision` to `task_plans`; every comment mutation increments it in
the same transaction. The table uses the existing task and current-plan rows
as cascade owners, keeps caller UUIDs for idempotent migration, and uses an
integer `version` for edit and delivery conflicts.
Extend `repository.PlanRepository` and `PlanService` with comment list/create/
update/delete operations. Add `task.plan.comments.*` actions in
`apps/backend/pkg/websocket/actions.go`, handlers beside
`task_plan_handlers.go`, and `task.plan.comments.changed` publication through
the task WebSocket broadcaster. List, mutation response, and event all carry a
complete `{task_id, plan_id, revision, comments}` snapshot.
### Prompt admission and routing
Add optional `plan_comment_refs` to `message.add` and `message.queue.add`.
Callers submit IDs and versions, not formatted comment text. The server loads
the authoritative rows, emits the current `### Plan Comments` Markdown shape,
and stores the expanded prompt.
Extend the existing direct user-message and durable queue transactions to
validate and conditionally delete the references while inserting the target
row and incrementing the collection revision. A leaf transaction helper shares
that logic between task-message and message-queue repositories. Existing
`client_message_id` provides direct replay; comment-bearing queue additions
gain `client_queue_id` and bypass immediate auto-merge so replay can resolve an
exact durable entry.
Plan-comment Run derives the task primary rather than the selected tab. Its
direct or queue request sets `require_primary_session`; the repository verifies
that designation under the task lock before accepting. Busy Run creates a
distinct queue entry instead of appending into unrelated text. Other comment
types retain the selected-session `useRunComment` behavior.
### Frontend task projection
Move `PlanComment` out of the session-indexed comments state and add a
task-keyed snapshot to task-plan state. Add a plan-comment API client and
WebSocket handler. `usePlanComments(taskId)` loads and reconciles complete
snapshots by plan ID and revision.
Update `TaskPlanPanel`, `usePlanComments`, `usePendingComments`,
`useChatPanelState`, and both structured and passthrough submit paths to consume
the task snapshot. Every session composer renders the same count chip and
submits the IDs and versions it displayed. The chip opens Plan and has no
remove action; task-wide edit/delete stays on each annotation.
Stop formatting plan comments in `buildSubmitMessage` and
`buildDocumentContext`; the server owns their canonical text. Keep client-side
formatting and clearing for all other comment types. Make selection Popover and
mobile Drawer mutations await backend acknowledgement, preserving text and
selection with inline localized failure feedback.
### Legacy migration
Once a task's current plan and sessions are known, scan
`kandev.comments.<sessionId>` for its session IDs. Upload only plan records with
their existing UUIDs, then remove each acknowledged plan record from its old
payload. Leave failed rows and every other comment source intact. Gate
comment-bearing Send and Run until migration resolves; a missing current plan
keeps the browser data for later recovery.
### Public documentation
Update the plan-comment paragraph in `docs/public/tasks-and-workflows.md` to
state that Add creates task-level pending context, all session composers show
it, ordinary Send addresses the selected session, and Run addresses the current
primary.
## Tests
| Acceptance criteria | Evidence |
| -------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| `AC-TASKS-PLAN-COMMENTS-001.1` to `.7` | Repository/service/handler tests for persistence, snapshots, task and plan cascades, session independence, orphan cleanup; frontend hook and Plan-panel tests |
| `AC-TASKS-PLAN-COMMENTS-002.1` to `.4` | Composer-state, context-item, structured-submit, and passthrough-submit unit tests |
| `AC-TASKS-PLAN-COMMENTS-002.5` to `.7` | Direct-message and queue repository integration tests for conditional consumption, rollback, concurrent losers, and untouched later comments |
| `AC-TASKS-PLAN-COMMENTS-003.1` to `.6` | `use-run-comment` tests plus backend primary-guard, busy queue, missing/terminal primary, and stale-primary tests |
| `AC-TASKS-PLAN-COMMENTS-004.1` to `.4` | Migration hook tests for multi-session records, idempotent retry, selective cleanup, failure, and send gating |
Tests added around the persistence and admission boundaries must run against
SQLite and the repository's Postgres schema/replay harness where that harness
owns dialect parity.
## E2E tests
- `apps/web/e2e/tests/session/task-plan-comments.spec.ts` creates one task with
a primary and secondary session. It proves the same annotation and context
item survive tab switches and reload; ordinary Send from the secondary lands
only in that session; a later Run from the secondary lands only in the
primary; each accepted path removes exactly its submitted comments task-wide.
Covers `AC-TASKS-PLAN-COMMENTS-001.1` to `.3`,
`AC-TASKS-PLAN-COMMENTS-002.1` to `.6`, and
`AC-TASKS-PLAN-COMMENTS-003.1` to `.3` and `.6`.
- `apps/web/e2e/tests/session/mobile-task-plan-comments.spec.ts` uses the
`mobile-chrome` project and the session picker plus Plan Drawer to prove the
shared annotation/context, selected-session Send, primary-session Run, 44 px
actions, and no horizontal overflow. It also seeds plan comments in two
legacy session-storage payloads, preserves a colocated diff comment, and
proves each plan comment migrates once into shared task context. Covers
`AC-TASKS-PLAN-COMMENTS-001.7` and the responsive form of the delivery
criteria plus `AC-TASKS-PLAN-COMMENTS-004.1` to `.4`.
## Work orders
- [x] [Task 01: Persist shared plan comments](task-01-persist-shared-plan-comments.md)
- [x] [Task 02: Consume comments during prompt admission](task-02-consume-comments-during-prompt-admission.md)
- [x] [Task 03: Project comments across task sessions](task-03-project-comments-across-task-sessions.md)
- [x] [Task 04: Migrate legacy browser drafts](task-04-migrate-legacy-browser-drafts.md)
- [x] [Task 05: Prove responsive multi-session behavior](task-05-prove-responsive-multi-session-behavior.md)
- [x] [Task 06: Document plan-comment routing](task-06-document-plan-comment-routing.md)
## Verification results
The [Plan comment recovery follow-up](../plan-comment-recovery/plan.md) refines
the migration and read-failure behavior from Tasks 04 and 05. Its completed work
order records the correction and current verification; the checkboxes and
results here describe the original delivery.
The original implementation checks below are historical. Current rebase and
review-remediation evidence is recorded separately; these results do not certify
the latest PR head.
- Backend: full `make test` and `make lint` passed; focused task and queue
admission packages also passed after final changes.
- Frontend: TypeScript, ESLint, i18n catalog/ratchet checks, 128 focused tests,
and the full 1,697-file Vitest suite (14,541 passed, 4 skipped) passed.
- Browser: production-build Chromium and `mobile-chrome` Playwright scenarios
both passed, including selected-session Send, primary-session Run, shared
consumption, reload, migration, retained diff context, touch targets, and
overflow checks.
- Specifications and public docs: spec lint, all 61 docs validator tests, and
validation of all 42 published pages passed.
### September 10 rebase and review remediation
- Rebased onto `adbe4c2ef7f41ced25533ff19ef05d916eb9056b`, preserving main's
queue lifecycle guards and the feature's durable plan-comment reservations.
The unfinished broader lifecycle investigation remains outside this patch.
- Added byte/count bounds, final rendered-prompt validation, stale primary
recovery protection, and manual-draft recovery for rejected initial prompts.
- Focused SQLite/Postgres tests passed in task service, repositories, handlers,
plan WebSocket errors, and orchestrator queue handlers/repositories using
`go test ... -run 'PlanComment|ResolveRejectsOversizedRenderedPrompt' -count=1`
with an isolated PostgreSQL database.
- The same focused repository checks passed with `-race` across task SQLite,
shared admission resolution, and message queue packages, including Postgres.
- Frontend typecheck and 101 focused Vitest tests passed across Run recovery,
initial prompts, Quick Chat modal, queued ghost rows, and edit protection.
Desktop/mobile layout and touch behavior are unchanged by these fixes.
- Full frontend lint, specification lint, all 62 public-doc validator tests,
and validation of 46 published pages passed.
- Latest-head CI and automated review disposition remain delivery gates; consult
PR #3332 rather than the original implementation's historical full-suite run.
## Implementation waves and parallel candidates
```text
Wave 1:
- Task 01
Wave 2:
- Task 02
Wave 3:
- Task 03
Wave 4:
- Task 04
- Task 06 (parallel-safe with Task 04)
Wave 5:
- Task 05
```
Implementation remains sequential unless the user explicitly authorizes
subagents. Task 06 is the only parallel-safe pair: it changes public Markdown
while Task 04 changes frontend migration code and tests.
## Risks
- Direct messages and queued prompts currently live behind different
repository interfaces. Their shared transaction helper must preserve the
global task-before-session lock order and both dialects' replay behavior.
- Existing `message.queue.append` auto-merges content. Plan Run must use an
independently identifiable queue row or transport retries can no longer
prove whether a comment was accepted.
- Tiptap positions are advisory across plan revisions. Selected-text fallback
and tagged projection transactions must remain intact when backend snapshots
replace session-local arrays.
- Session-storage migration is tab-local and can be interrupted. Cleanup must
happen per acknowledged UUID, never by deleting an entire session key.
- A stale or failed comment load must fail closed for comment-bearing delivery