status: in_progress
|
|
created: 2026-08-23
|
|
updated: 2026-08-23
|
|
spec: ../../specs/platform/requirements/e2e-duration-aware-sharding.md
|
|
---
|
|
|
|
# Keep merge-queue E2E checks within the response budget
|
|
|
|
## Root cause
|
|
|
|
PR #2950 was removed from the merge queue because the required `E2E Tests
|
|
Passed` check failed. The normal shard 14 job reached its 25-minute job
|
|
timeout twice, at `14:11:29Z` and `13:46:49Z`, after the same 167-test serial
|
|
plan had run for about 24 minutes. The report job and aggregate gate then
|
|
failed because the shard was cancelled. The queue ruleset allows 60 minutes
|
|
for required checks, so the 25-minute shard cap was the smaller limit.
|
|
|
|
The run used the deterministic count fallback because no successful `main`
|
|
timing-profile artifact existed yet. The fix gives that fallback's normal
|
|
shard enough bounded execution time to finish without changing per-test
|
|
timeouts, retry behavior, or the fail-closed aggregate gate.
|
|
|
|
## Outcome
|
|
|
|
Set the normal E2E matrix job timeout to 35 minutes and protect that queue
|
|
budget with the existing workflow contract test. Keep the container, desktop,
|
|
report, and Playwright timeouts unchanged.
|
|
|
|
## Wave 1: queue-safe normal shard budget
|
|
|
|
Task 01 updates the workflow contract, the E2E workflow, and the affected
|
|
spec/plan records. It runs the focused contract test and checks that the
|
|
worktree diff is valid.
|
|
|
|
## Verification
|
|
|
|
```text
|
|
python3 .github/scripts/e2e-tests-workflow-contract_test.py
|
|
git diff --check
|
|
```
|
|
|
|
The next merge-group run is the operational verification: shard 14 must reach
|
|
a terminal test result, the report must merge, and `E2E Tests Passed` must be
|
|
successful for the PR to remain in the queue.
|
|
|
|
## Status
|
|
|
|
- [x] Confirm queue removal event and failed synthetic merge-group checks.
|
|
- [x] Confirm the repeated shard timeout and ruleset response budget.
|
|
- [x] Add the regression contract and raise only the normal shard job budget.
|
|
- [ ] Push the fix to PR #2950 and re-check the current-head queue state.
|
|
|
|
## Local implementation result
|
|
|
|
- Added a workflow contract assertion for the normal 35-minute shard budget.
|
|
- The new assertion failed against the old 25-minute workflow, then passed
|
|
after the workflow change.
|
|
- `python3 .github/scripts/e2e-tests-workflow-contract_test.py` passed, 5 tests.
|
|
- `git diff --check` passed.
|