35 lines
1.5 KiB
Markdown
35 lines
1.5 KiB
Markdown
---
|
||
id: "04-realistic-e2e-coverage"
|
||
title: "Realistic E2E coverage"
|
||
status: done
|
||
wave: 4
|
||
depends_on: ["03-client-state-contract"]
|
||
plan: "plan.md"
|
||
spec: "../../specs/platform/requirements/background-work-liveness.md"
|
||
---
|
||
|
||
# Task 04: Realistic E2E coverage
|
||
|
||
- **Acceptance:** The mock background scenario closes its foreground turn before
|
||
its workload; desktop and mobile tests observe background-working plus
|
||
instant-send during that interval; a foreground reply temporarily takes
|
||
orange precedence; done appears only after workload completion.
|
||
- **Verification:** `cd apps/web && pnpm e2e:run tests/chat/busy-signal.spec.ts tests/chat/mobile-busy-signal.spec.ts`.
|
||
- **Files likely touched:** `apps/backend/cmd/mock-agent/handler.go` and tests,
|
||
`apps/web/e2e/tests/chat/busy-signal.spec.ts`, and
|
||
`mobile-busy-signal.spec.ts`.
|
||
- **Dependencies:** Tasks 01–03.
|
||
- **Inputs:** existing `/background` test path demonstrates the old blind spot
|
||
and should remain available for held-open-turn coverage.
|
||
- **Output contract:** Report the RED failure, GREEN run, desktop/mobile
|
||
outcomes, artifacts/blockers, and mark this task plus its plan checkbox done.
|
||
|
||
## Result
|
||
|
||
The new `/detached-background` mock command returns the foreground response,
|
||
leaves a Claude-shaped async workload alive, and emits a later
|
||
task-notification lifecycle boundary. The first browser run caught the chat
|
||
status row's coarse-state dependency; after fixing that consumer, all four
|
||
desktop tests and both Pixel 5 tests pass, including foreground precedence and
|
||
reload hydration.
|