Queued run scheduling

Why

Workflow actions and Office automation can enqueue agent work without a user clicking Start. Users need that work to be dispatched reliably across multiple workspaces without making ordinary Kanban assignment autonomous, wasting resources on Office-only scans when Office is unused, or producing database errors during a normal shutdown.

What

  • Kandev has one backend-wide scheduler for the persisted runs queue. It serves every workspace and never creates one scheduler goroutine per workspace.
  • Runs are claimed globally in request order while preserving the existing per-agent serialization rule. A busy workspace does not create another scheduler or bypass agent capacity checks.
  • An explicit queue_run workflow action may enqueue work from any workflow style. User-initiated Kanban launches continue to bypass runs and launch through the interactive orchestrator path.
  • Merely assigning a runner to an ordinary Kanban task does not make that task autonomous. Office assignment subscribers and unstarted-task recovery act only on authoritative Office tasks: tasks linked to an Office project or tasks whose workflow is the workspace's canonical office_workflow_id.
  • Office-only maintenance is separate from queue draining. Unstarted-task recovery, Office routines, and Office budget work run only when their corresponding Office configuration exists. A deployment with Office enabled but no configured Office workflow performs no five-second Office task recovery scan.
  • The queue scheduler remains event-driven: an in-process queue signal wakes it immediately, while a periodic safety pass recovers persisted work after a missed signal or process restart.
  • Every scheduler or cron loop owns the goroutine it starts. Stop is idempotent, cancels future ticks, and waits for an in-progress tick and any handler fan-out to return.
  • Graceful shutdown stops external intake, quiesces and joins queue/cron schedulers, stops the orchestrator and agent runtime, and only then closes event-bus, repository, and database resources.
  • A normal signal-driven shutdown emits no sql: database is closed scheduler errors and does not log scheduler activity after Graceful shutdown complete.

Decision: ADR-2026-08-01-global-run-scheduler-ownership.

Implementation plan: run-scheduler-lifecycle.

Data model

No schema change is required.

  • runs remains the durable, backend-wide queue and run record.
  • workspaces.office_workflow_id plus a non-empty task project_id remain the authoritative persisted Office-task identity used by Task.IsFromOffice.
  • Office routines, budget policies, and related configuration remain workspace-scoped in their existing tables.

State machine

Scheduler lifecycle

stopped -> running -> stopping -> stopped
  • Start moves stopped -> running and owns exactly one loop goroutine.
  • A duplicate Start while running is a no-op.
  • Stop moves running -> stopping, cancels the loop, waits for the active tick to drain, then moves to stopped.
  • A duplicate Stop is a no-op.
  • Parent-context cancellation follows the same drain path as Stop.

Persisted run lifecycle

The existing queued, claimed, and terminal run states are unchanged. Process shutdown does not create a new run state and does not mark queued work failed. A claimed run interrupted by process exit is recovered through the existing stale-claim policy after restart.

Failure modes

Condition Required behavior
Queue signal is missed The periodic safety pass eventually claims the persisted row.
No eligible run exists The scheduler returns to waiting without an error.
Office is enabled but no Office workflow/configuration exists Generic queue recovery remains available; Office-only recovery and cron work do not scan ordinary Kanban tasks.
A Kanban task has a runner but no explicit queue_run action Office subscribers and recovery ignore it; the user or Kanban workflow controls launch timing.
Shutdown begins while the scheduler is idle Stop cancels the wait and joins before the database closes.
Shutdown begins during a tick Shutdown cancels future ticks and waits for the active tick and cron handler fan-out to return before repository cleanup. The backend does not impose an internal join deadline.
A handler does not return after cancellation Graceful shutdown remains in progress and repository cleanup does not begin. The launcher or process supervisor may enforce its outer grace period and terminate the process, but the backend never closes SQLite underneath live scheduler work.

Persistence guarantees

  • Queued and scheduled-retry runs survive restart.
  • Shutdown never deletes or terminally fails a queued run merely because the process is exiting.
  • Scheduler ownership state, contexts, timers, and in-memory queue signals do not survive restart; persisted rows are the recovery source of truth.
  • Office activation state is derived from persisted workspace/workflow and Office configuration rather than an in-memory workspace list.

Scenarios

  • GIVEN two workspaces have queued runs for different agents, WHEN the global scheduler drains the queue, THEN it processes both workspaces in request order while allowing at most one claimed run per agent.
  • GIVEN Office mode is enabled and no workspace has an Office workflow, Office project, active Office routine, or Office budget policy, WHEN the backend remains idle, THEN no Office unstarted-task recovery query runs on the five-second queue cadence and no task is launched.
  • GIVEN an ordinary Kanban TODO task has a step runner, WHEN Office assignment subscribers and recovery execute, THEN no task_assigned run is created for that task.
  • GIVEN an authoritative Office TODO task has a runner, was created inside the recovery lookback window, and has no prior queued, claimed, or finished run, WHEN Office recovery executes, THEN exactly one idempotent task_assigned run is queued.
  • GIVEN a custom non-Office workflow explicitly executes queue_run, WHEN the row is persisted and signalled, THEN the global scheduler processes it even though the task is not an Office task.
  • GIVEN the backend receives SIGINT while all schedulers are idle, WHEN graceful shutdown completes, THEN the database closes after every scheduler has stopped and the log contains no database is closed error.
  • GIVEN a scheduler tick or cron handler is blocked inside database-backed work, WHEN graceful shutdown begins, THEN shutdown waits for that work to return before closing the database and prints no scheduler-stopping log after the completion message.
  • GIVEN queued runs exist when the process exits, WHEN Kandev starts again, THEN the periodic safety pass resumes them without requiring an Office workspace to own a separate scheduler.

Out of scope

  • Multiple active backend processes or distributed leader election.
  • Per-workspace scheduler goroutines.
  • Changing global FIFO ordering or adding workspace fairness/quotas.
  • Renaming the existing office.run.* WebSocket subjects.
  • Changing retry counts, retry backoff, or agent cooldown policy.
  • Adding a user-facing scheduler status page or new feature toggle.
  • Replacing the five-second generic safety cadence with dynamic retry timers; this change removes Office-only work from that cadence but preserves its existing queue-recovery contract.