2.0 KiB
2.0 KiB
id, title, status, wave, depends_on, plan, spec
| id | title | status | wave | depends_on | plan | spec | |
|---|---|---|---|---|---|---|---|
| 02-document-workflow-export | Document MCP workflow export | done | 2 |
|
plan.md | ../../specs/integrations/requirements/external-mcp.md |
Task 02: Document MCP Workflow Export
Intent
Update the public External MCP reference and coverage metadata for export_workflow_kandev.
Acceptance
- The public reference lists workflow export and states the correct live external tool count.
- The static-preview caveat identifies the new tool as omitted and non-authoritative.
- Public coverage metadata includes
export_workflow_kandev, and both document validation commands pass.
Verification
node --test scripts/validate-public-docs.test.mjs && node scripts/validate-public-docs.mjs
Files likely touched
docs/public/automation-and-mcp.mddocs/public/coverage.json
Dependencies
Task 01 must fix the final tool name, surface, and result contract.
Parallelism
Sequential. This task follows the backend contract and changes only public documentation.
Inputs
docs/specs/integrations/requirements/external-mcp.md, API surface and scenarios.docs/plans/workflow-mcp-export/plan.md, Public documentation section.- The final registered tool counts from Task 01.
Risks
- Do not present the static settings preview as the live tool contract.
- Do not document a workspace-level batch tool.
Output contract
Report the files changed, exact document validation results, remaining risks, and task status. Update this task and plan.md in the same conversation.
Results
- Updated
docs/public/automation-and-mcp.mdwith the live external MCP count of 36, the workflow export contract, and the non-authoritative static-preview omission list. - Added
export_workflow_kandevtodocs/public/coverage.json. - Verification:
node --test scripts/validate-public-docs.test.mjspassed 61 tests with 0 failures. - Verification:
node scripts/validate-public-docs.mjsvalidated 41 published docs pages.