id, title, status, wave, depends_on, plan, requirements, acceptance_criteria, system_design
id title status wave depends_on plan requirements acceptance_criteria system_design
03-runtime-completion Apply configured task completion done 3
02-portable-contracts
plan.md
REQ-TASKS-COMPLETION-001
REQ-TASKS-COMPLETION-002
AC-TASKS-COMPLETION-001.2
AC-TASKS-COMPLETION-001.3
AC-TASKS-COMPLETION-001.9
AC-TASKS-COMPLETION-001.10
AC-TASKS-COMPLETION-001.11
AC-TASKS-COMPLETION-001.12
AC-TASKS-COMPLETION-002.5
AC-TASKS-COMPLETION-002.10
AC-TASKS-COMPLETION-002.13
../../specs/tasks/system-design/task-completion.md

Task 03: Apply configured task completion

Summary

Make the saved setting authoritative for task completion and keep ordinary completed task conversations promptable. Preserve event ordering, clarification behavior, and idle cleanup.

In scope

  • Replace name-based completion with final-position eligibility plus the explicit setting, including initial creation, manual/bulk moves, queued promotion, workflow-store transitions, cancellation-driven transitions, and automatic steps. Resolve actual successor/order evidence in every path.
  • Make parent rollups depend on persisted task outcomes; remove step-membership fallback and preserve DependencyStatusForTask's existing state-only resolution. Do not evaluate resident tasks when only a step setting changes.
  • Replace successful child terminal collapse with the root waiting behavior while retaining active-question handling and fail-closed resource reclamation. Preserve failed/cancelled receipt behavior.
  • Guard chat turns on completed tasks against task-state promotion and automatic turn-start/turn-complete workflow transitions, including built-in Done-to-In-Progress actions.

Out of scope

Historical COMPLETED-session resume and the new editor are later work.

Acceptance

  • Checked final arbitrary-name steps complete; unchecked final Done and checked non-final steps do not. Reordering retains values without transferring completion to the new final step. Every entry path agrees, and explicit movement can still reopen a task.
  • Only committed successful outcomes resolve dependencies; existing failed/cancelled parent rollups and duplicate suppression remain intact.
  • Root/child follow-ups keep completed task state and step; active clarification remains answerable, cleanup retains recovery data, and old receipts cannot affect newer work.

TDD entry

Add workflow_completion_policy_test.go with TestCompletionPolicyEntryPaths and TestCompletionPolicyNotifications. First assert an unchecked final Done remains nonterminal and a checked final arbitrary-name step completes. Cover a checked step moved earlier: it cannot complete work while non-final. Change the old terminal-child regression to expect a promptable session and run it RED before changing handlers.

Verification

Run from apps/backend/. PostgreSQL-dependent cases use an isolated KANDEV_TEST_POSTGRES_DSN; never point tests at the reported installation.

rtk go test -race ./internal/workflow/models ./internal/task/service -run 'Test.*(Completion|Terminal|Move|Workflow|Dependenc)' -count=1
rtk go test -race ./internal/orchestrator -run 'Test.*(CompletionPolicy|ChildrenCompleted|TerminalStep|HandleAgentCompleted_Subtask|HandleAgentCompleted_NonTerminalSubtask|HandleAgentCompleted_Sibling|SubtaskTerminal|Reclaim|Clarification|Workflow.*Cancel)' -count=1

Files likely touched

  • apps/backend/internal/workflow/models/terminal.go
  • apps/backend/internal/workflow/models/terminal_test.go
  • apps/backend/internal/task/service/service_workflow.go
  • apps/backend/internal/task/service/service_dependencies.go
  • apps/backend/internal/orchestrator/workflow_store.go
  • apps/backend/internal/orchestrator/task_launch_workflow.go
  • apps/backend/internal/orchestrator/event_handlers_workflow.go
  • apps/backend/internal/orchestrator/event_handlers_children_completed.go
  • apps/backend/internal/orchestrator/event_handlers_dependencies.go
  • apps/backend/internal/orchestrator/event_handlers_streaming.go
  • apps/backend/internal/orchestrator/event_handlers_agent.go
  • apps/backend/internal/orchestrator/workflow_completion_policy_test.go (new)
  • apps/backend/internal/orchestrator/event_handlers_subtask_waiting_test.go
  • apps/backend/internal/orchestrator/event_handlers_reclaim_wiring_test.go

Dependencies

Complete 02-portable-contracts first.

Risks

Do not conflate failed-child terminal rollups with successful dependencies. Do not infer completion after a failed state write. Avoid notification replay from chat activity or checkbox edits. Existing tests that seed Done by name must set the new boolean intentionally.

Parallelism

sequential

Inputs

  • Requirements, criteria in frontmatter.
  • System design.
  • Plan, confirmed source trace and existing reproduction tests.
  • Nearby Go repository/handler tests supply fixture conventions.
  • Follow /tdd in the primary session.

Results

Done. TDD evidence:

  • RED: TestHandleAgentCompleted_SubtaskWithoutRequestsInputRemainsPromptable first failed because the successful child was collapsed to COMPLETED.
  • The runtime predicate now requires a final step with complete_task_on_enter: true; arbitrary final names are supported, unchecked final Done is nonterminal, and checked non-final steps are nonterminal.
  • Successful child terminal receipts remain promptable and reclaim their idle provider runtime. Failed/cancelled receipt behavior and clarification barriers remain unchanged.

Verification:

  • rtk go test -race ./internal/task/service -run 'Test.*(Completion|Terminal|Move|Workflow|Dependenc)' -count=1 (218 passed)
  • rtk go test -race ./internal/orchestrator -run 'Test.*(CompletionPolicy|ChildrenCompleted|TerminalStep|HandleAgentCompleted_Subtask|HandleAgentCompleted_NonTerminalSubtask|HandleAgentCompleted_Sibling|SubtaskTerminal|Reclaim|Clarification|Workflow.*Cancel)' -count=1 (159 passed)