Files
kandev/docs/plans/attach-workspace-sources/task-13-ux-delta-e2e.md
T
Carlos Florêncio bc218dfbbe feat: add workspace sources from files panel (#1900)
* feat: add workspace sources from files panel

* fix: preserve worktree identity during recovery

* feat: unify workspace source actions

* fix: validate recovered workspace repositories

* fix: harden workspace source filesystem boundaries

* test: split workspace repository chip coverage

* fix: restrict repository rescan recovery paths

* fix: stabilize workspace source CI checks

* test: canonicalize workspace source paths

* test: align workspace source container paths

* fix: populate direct workspace repository names

* test: preserve git fixture rewrites across restarts

* test: isolate backend git fixture config

* fix: resume remote workspace executions before creation

* fix: preserve ssh agent identity during resume

* fix: preserve SSH workspace across backend restart

* fix: simplify workspace actions trigger

* fix: refine add workspace repositories UX

* docs: narrow workspace source UX updates

* fix: avoid phantom turn on session resume

* test(web): normalize workspace source request headers

* feat(web): streamline workspace source picker

* docs: remove trailing spaces from workspace source plan

* fix: prevent resume status from creating phantom turns

* fix(web): stabilize workspace source attachment

* refactor(web): extract workspace source store contract

* fix: avoid phantom turns on idle agent resume

* fix: address backend static analysis findings

* fix: preserve agentctl readiness status value

* fix: preserve resume messages without active turns

* fix: resume agents from promoted workspace root

* chore: merge origin/main into feature/add-new-repo-folder-d97

* feat(web): explain workspace source consequences

* test(websocket): count session activity subscription
2026-07-25 21:29:53 +01:00

2.3 KiB

id, title, status, wave, depends_on, plan, spec
id title status wave depends_on plan spec
13-ux-delta-e2e UX delta end-to-end coverage done 8
11-shared-local-remote-selector
12-unified-files-workspace-actions
plan.md ../../specs/tasks/attach-workspace-sources.md

Task 13: UX delta end-to-end coverage

Acceptance

  • Desktop E2E opens the combined menu, exercises both actions, adds sources through the tab-free repository-kind menu, and proves mixed rows remain visible.
  • Mobile E2E proves the 44px trigger/menu geometry, inset action menu, full-height Add sources drawer, safe-area/footer containment, no document horizontal overflow, submit outcome, and focus return.
  • Executor E2E enters Add sources through the combined menu and continues proving capability filtering without weakening backend source validation. The disposable HTTP Git fixture uses test-appropriate provider semantics instead of mislabeling a bridge URL as GitLab.

Verification

cd apps/web && pnpm e2e:run e2e/tests/task/add-workspace-sources.spec.ts
cd apps/web && pnpm e2e:run e2e/tests/task/mobile-add-workspace-sources.spec.ts
cd apps/web && KANDEV_E2E_CONTAINERS=1 pnpm e2e -- \
  e2e/tests/docker/add-workspace-sources.spec.ts \
  e2e/tests/ssh/add-workspace-sources.spec.ts \
  --project=containers

Files likely touched

  • apps/web/e2e/tests/task/add-workspace-sources.spec.ts
  • apps/web/e2e/tests/task/mobile-add-workspace-sources.spec.ts
  • apps/web/e2e/tests/docker/add-workspace-sources.spec.ts
  • apps/web/e2e/tests/ssh/add-workspace-sources.spec.ts
  • apps/web/e2e/helpers/http-git-server.ts
  • Existing E2E page objects/helpers only when the same interaction is repeated.

Dependencies

Tasks 11 and 12.

Inputs

  • Spec: combined-menu, selector-parity, mixed-row, active-turn, and phone scenarios.
  • Plan: Tests, E2E Tests, and Mobile design contract.
  • Mobile project: configured mobile-chrome Pixel 5; do not add per-test device overrides.

Output contract

  • Update only this task file to in_progress when starting and done after acceptance and verification pass.
  • Return a compact handoff capsule with exact test names, commands/results, screenshot or rendered evidence, environment blockers, risk tags, and any uncertainty.
  • Do not update plan.md; the planner serializes shared-plan status.