id, title, status, wave, depends_on, plan, spec
id title status wave depends_on plan spec
09-e2e-agent-dashboard E2E: agent dashboard run-activity legend pending 6
08-run-outcome-frontend
plan.md ../../specs/task-delivery-ledger/spec.md

Task 09: E2E: agent dashboard run-activity legend

One assertion on the only user-visible change in this card.

Scenario. GIVEN an Office agent with runs on a day, WHEN the agent dashboard is opened, THEN the Run Activity legend shows the succeeded, skipped, unclassified, failed and other buckets and the chart renders without error.

Extend the existing apps/web/e2e/tests/office/agent-dashboard.spec.ts rather than adding a new spec file — this is an additional assertion on a route that already has coverage, not a new user flow.

The ledger gets no E2E: it has no user-visible surface, which the spec's Out of scope fixes as a contract. Do not add board columns, badges, filters or dashboard tiles for it here.

  • Acceptance:

    1. The extended spec passes against a seeded Office agent.
    2. The legend assertion reads the translated labels the way the rest of the suite does, not hardcoded English that would break under the pseudo-locale.
    3. No new spec file is added and no unrelated spec is modified.
  • Verification: cd apps && pnpm install --frozen-lockfile && cd apps/web && pnpm e2e:raw -- e2e/tests/office/agent-dashboard.spec.ts

  • Files likely touched:

    • apps/web/e2e/tests/office/agent-dashboard.spec.ts
    • apps/web/e2e/fixtures/ or apps/web/e2e/helpers/ only if the existing seed does not produce runs with distinct outcomes
  • Dependencies: Task 08.

  • Parallelism: sequential — it verifies task 08's rendered output.

  • Inputs: Spec Office run outcome scenarios; plan E2E Tests; apps/web/e2e/README.md; the existing agent-dashboard.spec.ts.

  • Output contract: summary, files changed, exact E2E command and pass/fail counts, any fixture changes, blockers, risks, and task/plan status update in the same conversation.

Results

Pending. Before marking this task done, replace this with every exact command actually run and its outcome/count, generated artifact paths, and cleanup or teardown evidence (including temporary capture-spec removal and git diff --check when used). Record security/trust and external side-effect boundaries when applicable, or explicitly state None.