id, title, status, wave, depends_on, plan, spec
| id | title | status | wave | depends_on | plan | spec | ||
|---|---|---|---|---|---|---|---|---|
| 03-terminal-close-e2e | Optimistic terminal close E2E | done | 3 |
|
plan.md | ../../specs/ui/requirements/terminal-close-feedback.md |
Task 03: Optimistic terminal close E2E
Intent
Prove desktop and phone remove a confirmed terminal while backend teardown is still unresolved.
Acceptance
- A shared WebSocket route pauses the next
user_shell.destroyrequest and forwards unrelated frames unchanged. - Desktop uses a compact anchored popover with no
alertdialog, then removes the target Dockview tab while paused; a sibling accepts input. mobile-chromemorphs the target row action into inline confirmation with noalertdialog, then removes the row and mounted terminal while paused; a sibling remains selectable and interactive without horizontal overflow.- The exact paused request is released after each assertion so fixture cleanup sees normal backend state.
Files
apps/web/e2e/tests/terminal/terminal-close-pause.tsapps/web/e2e/tests/terminal/terminal-dockview-ui.spec.tsapps/web/e2e/tests/terminal/mobile-terminal-close.spec.ts
Verification
cd apps/web
pnpm e2e:run tests/terminal/terminal-dockview-ui.spec.ts -- --grep "confirmed busy close removes the terminal before teardown settles"
pnpm e2e:run --project mobile-chrome tests/terminal/mobile-terminal-close.spec.ts
Results
- Deterministic paused-transport assertions replace observation of transient teardown progress.
- Desktop Chromium: 1 delayed-destroy test passed.
- Mobile Chrome: 1 delayed-destroy test passed with the same production web/backend build.
- The E2E sleep ratchet passed with no new fixed sleeps.