Implementation Plan: Sidebar Last Activity Sort
Overview
Add a durable task activity timestamp to the bounded task-status summary. Keep summary freshness separate, then expose the activity timestamp through a new saved-view sort on desktop and mobile.
The work also closes the observed GitHub refresh loop. REST and batched GraphQL status snapshots must converge on one semantic task-PR value, and diagnostics must name fields that cause a real update.
Confirmed current behavior
apps/web/components/task/task-session-sidebar-item.tsmaps summaryupdated_attoTaskSwitcherItem.updatedAt.apps/web/lib/sidebar/apply-view.tsusesupdatedAtfor the saved-viewupdatedAtcomparator.apps/web/components/task/task-item-stats-row.tsxrenders the same value as the row's relative time.apps/backend/internal/task/statussummary/projector.gostampsTaskStatusSummary.UpdatedAtwhen any semantic summary field changes.- The projector subscribes to
github.task_pr.updated, so provider status can refresh the visible time of an idle task. - Sidebar views persist arbitrary sort strings through portable user settings.
Frontend
KNOWN_SORT_KEYScontrols which keys survive migration. - Desktop and phone surfaces share
SortPicker,applySort, saved-view state, and user-settings synchronization.
Architecture
Timestamp ownership
Extend TaskStatusSummary with semantic LastActivityAt. Keep UpdatedAt as
transport and projection freshness.
Add a narrow TaskActivityRepository to the task service. Its batch query
returns the maximum of:
tasks.created_atandtasks.updated_at- user-authored
task_session_messages.created_at - non-reserved user-owned
queued_messages.queued_at task_session_turns.started_atand non-nullcompleted_at
The query accepts task IDs, returns one map, and uses the existing task/message and turn indexes. Add an index only if query-plan evidence shows a missing leading task key on a production-sized fixture.
Live projection and repair
Add lastActivityAt to projector state and persisted semantic JSON. Rehydrate
it from the stored summary and a narrow activity loader.
Subscribe to task.created, task.state_changed, turn.started, and
turn.completed in addition to the existing task, message, and queue events.
Apply timestamps as follows:
task.created,task.updated, andtask.state_changed: payloadupdated_at, withcreated_atas the creation fallbackmessage.added:created_atonly forauthor_type=user- successful user-owned queue admission:
queued_at turn.started:started_atturn.completed:completed_at
Use a monotonic maximum. Foreground-activity task events carry the task row's unchanged timestamp and therefore cannot advance task activity.
Task-list reconciliation batch-loads activity for all requested tasks. It repairs missing fields and preserves a newer stored value during compare-and-set retries. The complete replacement summary continues to use the existing event.
GitHub refresh stability
Normalize GraphQL check-rollup states to the documented success, failure,
pending, or empty contract before SyncTaskPR compares fields. Exercise the
same semantic fixture through REST feedback and batched GraphQL conversion.
Refactor the SyncTaskPR comparison into a helper that returns changed field
names. Publish only when that list is non-empty. Log the names at debug level
with task and PR identity, without old or new values.
Saved-view and row behavior
Add lastActivityAt to SortKey, KNOWN_SORT_KEYS, SORT_OPTIONS, and the
comparator table. Thread lastActivityAt from status_summary into
TaskSwitcherItem, with task update and creation fallbacks.
When the effective view uses this key, rows display activity time. Other views retain the existing time selection. Keep stable input order for equal values.
Add localized Last activity copy to English, Portuguese, Simplified Chinese, Hong Kong Chinese, Taiwan Chinese, and pseudo catalogs. Run the Traditional Chinese generator instead of translating both variants by hand.
Mobile design contract
- Outcome and entry: desktop opens the Tasks section view editor. Phones
open
SessionTaskSwitcherSheet, then the existing filter gear. - Exemplar: keep
apps/web/components/task/mobile/session-task-switcher-sheet.tsxand the sharedSidebarFilterPopovercomposition. - Hierarchy and presentation: the sort remains a short temporary choice in the existing selector. No route, drawer, or nested overlay is added.
- Interaction: the existing selector row is the touch target. Selection updates the shared draft and live task order.
- Scroll and geometry: the task list remains the only vertical scroll body. The existing drawer and portaled selector remain inside the Pixel 5 viewport with no document horizontal overflow.
- Shared state: saved-view state, activity mapping, comparator, direction, persistence, and rollback are shared between desktop and mobile.
Tests
Use Red-Green-Refactor for each implementation task. Run each focused test before production edits and record the expected failure. Run the same test after the smallest implementation, then refactor while it remains green.
Backend
- GitHub conversion tests cover every GraphQL rollup state and prove an equivalent REST/GraphQL sequence emits no second task-PR update.
- Activity repository tests cover tasks without sessions, queued user prompts, active turns, completed turns, multiple sessions, and batched task IDs.
- Summary model tests cover semantic JSON, equality, compatibility with absent activity, and monotonic timestamps.
- Projector tests cover every included source, including state-only task transitions. They prove focus-adjacent status, PR, Git, queue, agent-message, and older replay events do not advance activity.
- Rebuild tests cover field backfill, no N+1 reads, compare-and-set retry, and preservation of a newer stored timestamp.
Frontend
- Comparator tests cover ascending, descending, equal times, and fallback.
- Migration, wire, hydration, and live user-settings tests preserve
lastActivityAtin saved views and drafts. - Sidebar mapping and rendered-row tests select activity time only for the new sort.
- Locale checks cover the new label in every required catalog.
E2E
- Desktop creates a view, selects Last activity, verifies order and row time, saves it, reloads, and verifies persistence.
- The backend regression proves a provider status refresh does not change the activity timestamp. The desktop flow verifies that resulting sort order.
- Mobile selects the same option from the task-switcher drawer and verifies order, persistence, touch reachability, viewport containment, scroll ownership, and zero horizontal overflow.
Verification commands
make -C apps/backend test lint build
cd apps && pnpm install --frozen-lockfile
cd apps && pnpm --filter @kandev/web exec vitest run lib/sidebar/apply-view.test.ts lib/state/slices/ui/ui-slice-migration.test.ts lib/state/slices/ui/sidebar-view-wire.test.ts components/task/task-session-sidebar-item.test.ts
cd apps/web && pnpm run typecheck
cd apps && pnpm --filter @kandev/web lint
cd apps/web && pnpm run i18n:zh-hant && pnpm run i18n:check && pnpm run i18n:ratchet
cd apps/web && pnpm e2e:run tests/task/sidebar-filter.spec.ts -- --grep "last activity"
cd apps/web && pnpm e2e:run --no-build --project mobile-chrome tests/task/mobile-sidebar-views.spec.ts -- --grep "last activity"
Implementation waves
- Task 01: Stabilize GitHub task-PR refreshes, wave 1
- Task 02: Add durable activity reconstruction, wave 1
- Task 03: Project task activity live, wave 2, after Task 02
- Task 04: Add the saved-view sort, wave 3, after Task 03
- Task 05: Prove desktop and mobile behavior, wave 4, after Tasks 01 and 04
This package does not authorize implementation subagents. Implementation stays in the user-controlled primary session.
Implementation result
All five tasks are complete. The implementation includes durable activity reconstruction, live bounded projection, GitHub refresh normalization, the desktop/mobile saved-view sort, localized catalogs, and production-build browser coverage.
Targeted checks passed during implementation:
- Backend focused GitHub, activity repository, summary, rebuild, projector, and backend-app tests.
- Frontend focused tests, typecheck, lint, i18n completeness, and i18n ratchet.
- One desktop Chromium E2E test and one mobile Chromium E2E test, both through the managed production-build runner.
The full backend test, lint, and build matrix passed as the final pre-PR gate.
Risks and boundaries
updated_atandlast_activity_atmust remain separate in semantic equality, persistence, DTOs, and UI mapping.- Event timestamps can arrive out of order. Every live and rebuild path needs a monotonic maximum.
- Counting all agent messages recreates high-frequency task-list traffic. Turn start and completion are the bounded agent milestones.
- Existing saved views and default view creation must not change.
- The GitHub normalization test must exercise both real conversion paths. A
handcrafted
PRStatuspair does not detect future adapter drift. - Public documentation does not describe sidebar sort choices today. No public documentation update is required.