id, title, status, wave, depends_on, plan, spec
| id | title | status | wave | depends_on | plan | spec | ||
|---|---|---|---|---|---|---|---|---|
| 04-e2e-coverage | Desktop and mobile E2E coverage | done | 3 |
|
plan.md | ../../specs/improve-kandev/spec.md |
Task 04: Desktop and mobile E2E coverage
Acceptance
- Desktop Playwright proves intro dismissal persistence, direct reopen, report-only task creation, and EMU implementation-versus-issue gating.
- Mobile Playwright opens the feature through Open menu → Improve Kandev, proves 44px touch targets, reaches Open issue, and detects no document horizontal overflow.
- Both specs pass against the production Vite build served by the Go backend.
Verification
cd apps/web && pnpm e2e:run tests/improve-kandev.spec.ts
cd apps/web && pnpm e2e:run --no-build tests/mobile-improve-kandev.spec.ts -- --project=mobile-chrome
Files likely touched
apps/web/e2e/tests/improve-kandev.spec.tsapps/web/e2e/tests/mobile-improve-kandev.spec.ts
Dependencies
Tasks 02 and 03.
Parallelism
Sequential. These specs share the Improve Kandev route mocks and production build.
Inputs
- All spec scenarios for dismissal, issue reporting, fork restrictions, auth, and mobile access.
- Plan: E2E Tests and Continuation Snapshot.
- Existing fixture APIs in
apps/web/e2e/helpers/api-client.ts.
Completed implementation notes
- Desktop tests for persistence, issue task workflow, and revised EMU behavior are already drafted. The focused persistence and issue-submission tests passed individually.
- The mobile spec is drafted. Its initial sidebar-based path failed because the desktop footer is hidden on phones; the test now uses the mobile menu.
- The mobile utility entry was rebuilt and verified after the initial sidebar path was corrected to use the native mobile menu.
Recorded verification
cd apps/web && pnpm e2e:run tests/improve-kandev.spec.ts— passed (7 desktop tests).cd apps/web && pnpm e2e:run --no-build tests/mobile-improve-kandev.spec.ts -- --project=mobile-chrome— passed (1 mobile test).- The first rebuilt mobile run caught a 43px preference target; the intro
checkbox label was increased to
min-h-12, then the rebuilt mobile run passed with the required touch target and no horizontal overflow.
Task 04 is complete. Continue with Task 05 for repository verification and commit.
Risks
- Route mocks must return both workflow IDs, and the submitted issue workflow must exist in the E2E backend before asserting its start step.
- Do not increase Playwright timeouts; inspect error context if the mobile drawer-to-dialog handoff races.
Output contract
The desktop and mobile Playwright suites prove the shared flow, touch-target requirements, report-only workflow, and mobile containment behavior.
Update this task and plan.md, report both exact commands and outcomes, include
fresh failure-artifact paths if any, and state whether rendered mobile
containment/touch behavior is proven.