id, title, status, wave, depends_on, plan, spec
| id | title | status | wave | depends_on | plan | spec | |||
|---|---|---|---|---|---|---|---|---|---|
| 04-connectivity-warning-e2e | Connectivity warning E2E | done | 4 |
|
plan.md | ../../specs/ui/requirements/ws-connectivity-warning.md |
Task 04: Connectivity warning E2E
Acceptance
- Production-build desktop E2E proves enabled-bar placement, feature-off sidebar fallback, yellow/red details, mutual exclusion, and immediate recovery.
- Pixel 5 E2E proves the feature-off warning is visible from persistent route chrome, reaches a 44 px Status action, opens a connection-only drawer, returns focus, and introduces no viewport or horizontal-overflow regression.
- Existing status-bar ordering/geometry E2E is updated only where the now-hidden healthy connection content is material; stable connection identity and saved ordering remain covered.
Verification
cd apps/web && pnpm e2e:run tests/layout/ws-connectivity-warning.spec.ts tests/layout/mobile-ws-connectivity-warning.spec.ts
Files likely touched
apps/web/e2e/tests/layout/ws-connectivity-warning.spec.tsapps/web/e2e/tests/layout/mobile-ws-connectivity-warning.spec.tsapps/web/e2e/helpers/connection-state.tsif a typed store-bridge helper keeps tests focusedapps/web/e2e/tests/layout/app-status-bar.spec.ts- Any existing page object that already owns the affected Status trigger, only if reuse is clearer than local selectors
Dependencies
Tasks 01–03.
Parallelism
Sequential. The E2E contract spans both rendered implementations.
Inputs
- Every spec scenario involving a visible surface.
- Plan:
E2E Tests. - E2E guidance: production managed runner, store bridge for derived-state injection, stable
data-testidselectors, andmobile-chromerouting through themobile-*.spec.tsfilename.
Risks
- Do not add real ten-second sleeps; unit tests own timing and E2E owns integration/presentation.
- A backend restart used to disable the feature must restore baseline configuration in teardown.
- Rebuild production assets through
pnpm e2e:run; do not test a stale Vite bundle.
Output contract
Report scenarios, screenshots/rendered evidence where captured, exact command and result,
blockers/risks, then mark this task done and update its checkbox in plan.md.