Files
kandev/docs/plans/github-issue-task-linking/task-03-e2e-and-verification.md
T
2026-08-23 17:34:52 +00:00

1.2 KiB

id, title, status, wave, depends_on, plan, spec
id title status wave depends_on plan spec
03-e2e-and-verification Issue indicator E2E and verification done 3
02-frontend-link-and-indicator
plan.md ../../specs/tasks/requirements/link-existing-task-github-issue.md

Task 03: Issue Indicator E2E And Verification

Acceptance

  • Desktop Playwright coverage proves linked/unlinked/multiple task states and task navigation.
  • Mobile Playwright coverage proves the indicator is reachable by touch and navigates without horizontal layout breakage.
  • Formatting, relevant tests, typecheck, and lint pass.

Verification

cd apps/web && pnpm e2e:run tests/github/issue-list-task-indicator.spec.ts
cd apps/web && pnpm e2e:run --no-build --project mobile-chrome tests/github/mobile-issue-list-task-indicator.spec.ts
make fmt && make typecheck test lint

Files Likely Touched

  • apps/web/e2e/tests/github/issue-list-task-indicator.spec.ts
  • apps/web/e2e/tests/github/mobile-issue-list-task-indicator.spec.ts
  • apps/web/e2e/helpers/api-client.ts

Output Contract

Report desktop/mobile results, full verification commands, files changed, blockers, and follow-up risks; mark this task done in this file and plan.md.