id: standard
|
|
name: Plan & Build
|
|
description: >-
|
|
Two-phase workflow: the agent first creates a plan for your review,
|
|
then implements it. Ideal for tasks that benefit from upfront design.
|
|
|
|
steps:
|
|
- id: todo
|
|
name: Todo
|
|
position: 0
|
|
color: bg-neutral-400
|
|
allow_manual_move: true
|
|
|
|
- id: plan
|
|
name: Plan
|
|
position: 1
|
|
color: bg-purple-500
|
|
is_start_step: true
|
|
show_in_command_panel: true
|
|
allow_manual_move: true
|
|
prompt: |
|
|
[PLANNING PHASE]
|
|
Analyze this task and create a detailed implementation plan.
|
|
Do NOT make any code changes yet — only analyze and plan.
|
|
|
|
{{task_prompt}}
|
|
|
|
STEP 0: CREATE A TASK LIST
|
|
Before anything else, create a task list tracking the substeps below (use your todo/task tracking tool if available). Mark each task in_progress when you begin it and completed when you finish. Do not skip ahead — each step feeds the next.
|
|
|
|
STEP 1: UNDERSTAND THE REQUIREMENTS
|
|
If anything is unclear or ambiguous, ask the user clarifying questions using the ask_user_question_kandev tool before proceeding.
|
|
|
|
STEP 2: EXPLORE THE CODEBASE
|
|
- Find similar features and understand how they are implemented.
|
|
- Identify the architecture and patterns in the relevant area.
|
|
- Map integration points and data flow.
|
|
|
|
STEP 3: CREATE THE PLAN
|
|
Create a plan that includes:
|
|
1. Understanding of the requirements
|
|
2. Files that need to be modified or created, and what each is responsible for
|
|
3. Step-by-step implementation approach
|
|
4. Potential risks or considerations
|
|
5. Alternative approaches considered and why the recommended one was chosen
|
|
|
|
When including diagrams (architecture, sequence, flowcharts, etc.), always use mermaid syntax in code blocks.
|
|
|
|
IMPORTANT: Save your plan using the create_task_plan_kandev MCP tool with the task_id provided in the session context.
|
|
After saving the plan, STOP and wait for user review. The user will review your plan in the UI and may edit it.
|
|
Do not create any other files during this phase — only use the MCP tool to save the plan.
|
|
events:
|
|
on_enter:
|
|
- type: enable_plan_mode
|
|
- type: auto_start_agent
|
|
|
|
- id: implementation
|
|
name: Implementation
|
|
position: 2
|
|
color: bg-blue-500
|
|
show_in_command_panel: true
|
|
allow_manual_move: true
|
|
prompt: |
|
|
[IMPLEMENTATION PHASE]
|
|
Implement the task following the approved plan.
|
|
|
|
{{task_prompt}}
|
|
|
|
STEP 0: CREATE A TASK LIST
|
|
Before anything else, create a task list tracking the substeps below (use your todo/task tracking tool if available). Mark each task in_progress when you begin it and completed when you finish. Do not skip ahead — each step feeds the next.
|
|
|
|
STEP 1: RETRIEVE THE PLAN
|
|
Before starting, retrieve the task plan using get_task_plan_kandev with the task_id from the session context.
|
|
Review the plan carefully, including any edits the user may have made.
|
|
Acknowledge the plan and any user modifications before proceeding.
|
|
|
|
STEP 2: IMPLEMENT
|
|
Use a TDD strategy — for each behavior:
|
|
1. Write a failing test that asserts the expected behavior
|
|
2. Run the test — confirm it fails with the expected assertion error
|
|
3. Write the minimum code to make it pass
|
|
4. Run the test — confirm it passes
|
|
5. Refactor while keeping tests green
|
|
6. Commit the change
|
|
|
|
Build incrementally — one behavior at a time, tests passing at every step.
|
|
Follow existing codebase conventions (naming, patterns, file organization).
|
|
You can update the plan during implementation using update_task_plan_kandev if needed.
|
|
|
|
STEP 3: STOP CONDITIONS
|
|
- If you hit a blocker (missing dependency, unclear requirement, test fails repeatedly): stop and ask the user.
|
|
- If a fix requires an architectural change (new DB table, new service layer, switching libraries): stop and ask.
|
|
- After 3 failed fix attempts on the same issue: stop, question the approach, ask the user.
|
|
|
|
STEP 4: ENSURE EVERYTHING IS COMMITTED
|
|
Before finishing this phase:
|
|
- Run `git status` to confirm there are no uncommitted or untracked changes that belong to this task.
|
|
- If anything is left, stage and commit it with a descriptive message.
|
|
- The phase is only complete when `git status` shows a clean tree on the task branch.
|
|
events:
|
|
on_enter:
|
|
- type: auto_start_agent
|
|
|
|
- id: done
|
|
name: Done
|
|
position: 3
|
|
color: bg-green-500
|
|
allow_manual_move: true
|