Task 05: Cross-fork desktop/mobile regression
Add deterministic browser coverage for the reported stale-fork failure and its manual recovery path. Use real temporary Git repositories plus the mock provider; do not assert only mocked numeric payloads.
Red tests first
Create an upstream repository, an outdated fork with the same main branch name, and a feature branch whose
single commit changes three files. Associate a mock provider PR whose head repository is the fork and target
repository is upstream. Before production changes, the fixture must reproduce inflated commits/diff from the
fork base.
Desktop scenario
Add apps/web/e2e/tests/git/fork-pr-comparison-target.spec.ts:
- create/start the fork-attached task and wait for its initial Git observation;
- associate through the real task-PR association route with complete provider head/base identity;
- assert target label
upstream/widget:main; - assert exactly one local contribution commit and the expected three-file
+/-scope in Changes/Review; - assert the task-card totals refresh without backend/session restart;
- reload and prove the same target and totals survive;
- choose fork
mainin Compare against, assert the provider target clears, and confirm this action does not change the PR base,origin, checkout branch, or push remote; and - cover an unreadable/colliding comparison target with the explicit unavailable state and no inflated totals.
Mobile scenario
Add apps/web/e2e/tests/git/mobile-fork-pr-comparison-target.spec.ts using the mobile project:
- open Changes through the normal mobile control;
- open the existing branch details touch drawer and assert the full target identity is accessible;
- assert the one-commit/three-file scope and unavailable-state recovery copy;
- perform the same-name manual override through touch input;
- verify one Changes scroll owner, touch-sized controls, no clipped drawer content, and no horizontal document overflow.
Fixture and cleanup rules
- Extend shared Git/provider helpers only where both specs reuse them.
- Use the managed E2E backend and API client; do not start a second backend.
- Keep repositories under the test-owned temporary directory and restore/reset shared seed state in cleanup.
- Use causal API/WS waits rather than arbitrary sleeps. Keep screenshots optional and deterministic.
Acceptance
- The exact public-repository fork topology that produced the bug is covered on desktop and mobile.
- The test fails against branch-only origin resolution and passes only when association, persistence, materialization, cache refresh, and UI are all connected.
- Existing PR drift/history and multi-PR E2E suites remain green.
Likely files
apps/web/e2e/tests/git/fork-pr-comparison-target.spec.ts(new)apps/web/e2e/tests/git/mobile-fork-pr-comparison-target.spec.ts(new)apps/web/e2e/helpers/git-helper.tsapps/web/e2e/helpers/api-client.tsapps/web/e2e/fixtures/*only if the existing fixture cannot express two remotesapps/backend/internal/backendapp/e2e_reset.goonly for provider identity fixture support not completed in Task 03
Verification
cd apps/web && pnpm e2e:run --host --no-build --project chromium -- e2e/tests/git/fork-pr-comparison-target.spec.ts
cd apps/web && pnpm e2e:run --host --no-build --project mobile-chrome -- e2e/tests/git/mobile-fork-pr-comparison-target.spec.ts
cd apps/web && pnpm e2e:run --host --no-build --project chromium -- e2e/tests/git/git-changes-panel.spec.ts e2e/tests/pr/pr-detection.spec.ts
cd apps/web && pnpm e2e:run --host --no-build --project mobile-chrome -- e2e/tests/git/mobile-pr-checkout-drift.spec.ts
Run cd apps && pnpm install --frozen-lockfile first in a fresh worktree.
Parallelism
sequential. Final integration gate after Tasks 01-04.
Output contract
Record the reproduced before-values, corrected after-values, desktop/mobile command results, cleanup behavior, and any remaining executor limitation. Mark Task 05 and the plan complete only after both new projects pass.
Completion record
- The fixture keeps the local fork's
origin/mainat the old commit, advances the disposable upstream, and basesfeature/forkon that upstream commit before adding one three-file contribution commit. - Corrected results are one local contribution commit, three PR files, and
upstream/widget:mainin both desktop and mobile Changes surfaces. The branch-only baseline would include the upstream commit and is therefore distinct from the asserted result. - Green commands:
pnpm e2e:run --host --no-build --project chromium -- e2e/tests/git/fork-pr-comparison-target.spec.tspnpm e2e:run --host --no-build --project mobile-chrome -- e2e/tests/git/mobile-fork-pr-comparison-target.spec.ts
- The host runner cleaned each disposable repository/backend fixture after the run; no executor limitation remains for this regression.