3.7 KiB
created, status, requirements, system_design
| created | status | requirements | system_design |
|---|---|---|---|
| 2026-08-23 | completed |
Implementation Plan: Specification migration
Overview
Migrate all editable specifications from the pre-system layout into system-owned requirements and system-design documents. The task system from PR #2957 and the residual task-owned sources are included in the completed result. Behavior is unchanged while ownership and traceability are explicit.
Scope
In scope
- Define system ownership for every remaining specification source.
- Create system indexes with migration state and authoritative specification maps.
- Extract stable
REQ-*andAC-*identifiers from each capability and move technical contracts into paired system-design documents when needed. - Update plans, decisions, indexes, and relative links to the new paths.
- Remove obsolete legacy files and size exceptions after each system is complete.
Out of scope
- Runtime code or product behavior changes.
- Changes to the completed
docs/specs/tasks/source documents except for links that point at migrated systems. - New product capabilities or changes to existing contracts.
Technical approach
Each source was assigned to one owning system. Observable requirements are
separated from technical design, large sources are split into bounded design
parts, and source detail is retained in the canonical documents. System
README migration states are complete because no editable legacy source
remains.
Ownership groups are: agents; auth; costs; integrations (including GitLab and provider-specific root specs); office; platform; plugins; system-page; workspaces; UI; and dedicated desktop, CLI, executor, and release/runtime systems for the remaining standalone sources. Cross-cutting sources must link to the owning system instead of duplicating its contract.
Tests
This documentation migration has no runtime test changes. Structural evidence is supplied by the specification linter, duplicate-ID checks, and the relative-link/reference audit in the final work order.
E2E tests
Not applicable. No user-visible behavior changes.
Work orders
- Task 01: Establish ownership map
- Task 02: Migrate core systems
- Task 03: Migrate integrations and Office
- Task 04: Migrate platform systems
- Task 05: Migrate plugins and runtimes
- Task 06: Migrate UI and standalone sources
- Task 07: Retire legacy references
- Task 08: Verify complete migration
Verification results
Completed on 2026-08-23:
python3 scripts/lint-spec-files.test.pypassed (19 tests).python3 scripts/lint-spec-files.py --allpassed.- Markdown link audit passed for migrated specification references; only the existing template placeholders and one unrelated historical application path remain outside the migration scope.
git diff --check -- docs/specs docs/decisions docs/planspassed.
Risks
- A source may describe more than one system; assign ownership before moving it, and use links rather than copied contract text for adjacent systems.
- Large legacy documents require capability or lifecycle splits to meet the new requirement and system-design size limits.
- Plans and decisions contain many relative links to legacy paths; reference repair must happen before deleting any legacy source.
- Stable requirement IDs must remain unique and must not be reused when a capability is split.