Task 03: E2E coverage and public documentation

Acceptance

  • Desktop Playwright proves an overlong remote PR prefill becomes a valid 60-character task title while retaining its remote source.
  • Mobile Playwright proves overlong issue prefill and manual input share the cap without breaking dialog containment or causing horizontal overflow.
  • Public task and MCP documentation state the 60-character contract and validation behavior.

Verification

(
  cd apps/web
  pnpm e2e:run --host --project chromium tests/github/pr-action-create-task-dialog.spec.ts
)
(
  cd apps/web
  pnpm e2e:run --host --project mobile-chrome tests/task/mobile-create-task-remote-repo.spec.ts
)
node --test scripts/validate-public-docs.test.mjs
node scripts/validate-public-docs.mjs

Files likely touched

  • apps/web/e2e/tests/github/pr-action-create-task-dialog.spec.ts
  • apps/web/e2e/tests/task/mobile-create-task-remote-repo.spec.ts
  • docs/public/tasks-and-workflows.md
  • docs/public/automation-and-mcp.md

Dependencies

  • Task 01: backend and MCP contract is complete.
  • Task 02: frontend input and prefill behavior is complete.

Parallelism

Sequential. This task verifies and documents the integrated behavior from Tasks 01 and 02.

Inputs

  • Spec scenarios for desktop/mobile input, remote prefill, and MCP validation.
  • Plan sections: E2E Tests, Public documentation, and Mobile design contract.
  • Existing Playwright fixtures and provider mocks in the two named spec files.

Risks

  • Run through pnpm e2e:run so the production Vite bundle and Go backend are rebuilt; --no-build would risk testing stale artifacts.
  • Preserve the existing mobile geometry assertions and use the configured mobile-chrome project rather than a per-test device override.

Output contract

Report changed files, exact E2E/docs commands and results, rendered mobile evidence, blockers and remaining risks, then mark this task done and update its checkbox in plan.md.