id, title, status, wave, depends_on, plan, requirements, acceptance_criteria, system_design
id title status wave depends_on plan requirements acceptance_criteria system_design
01-preview-state-and-sandbox Establish preview state and sandbox contract cancelled 1
plan.md
REQ-UI-NATIVE-HTML-PREVIEW-001
AC-UI-NATIVE-HTML-PREVIEW-001.3
AC-UI-NATIVE-HTML-PREVIEW-001.4
AC-UI-NATIVE-HTML-PREVIEW-001.5
AC-UI-NATIVE-HTML-PREVIEW-001.6
AC-UI-NATIVE-HTML-PREVIEW-001.7
AC-UI-NATIVE-HTML-PREVIEW-001.10
../../specs/ui/system-design/native-html-preview.md

Task 01: Establish preview state and sandbox contract

Summary

This work order described the first static-only prototype. Its empty iframe and inert-script contract was superseded when the owner reaffirmed the inline-JavaScript requirement. It is retained as history and is not evidence for the current plan.

In scope

  • The previously implemented format-neutral preview state and legacy Markdown restoration are reusable inputs for the revised work.
  • The previous static document builder and navigation normalizer are reusable only as defense in depth.

Out of scope

  • Treating an empty sandbox or script-src 'none' as the final preview execution boundary.
  • Shipping the static-only HTML preview contract.

Acceptance

  • Cancelled. The original acceptance conditions required scripts to remain inert and therefore conflict with the approved script-capable contract.

Verification

Not applicable. Use Task 05 and Task 06 for the replacement work.

Files likely touched

  • apps/web/lib/utils/file-types.ts
  • apps/web/lib/html-preview/
  • apps/web/hooks/use-file-editors.ts

Dependencies

Replaced by Tasks 05 and 06.

Risks

Treating the old static tests as final evidence can conceal the missing inline JavaScript capability.

Parallelism

sequential

Inputs

  • The superseded static prototype commit and its test results.
  • The revised requirements and system design.

Results

Cancelled after review. No production contract is accepted from this work order.