1.2 KiB
1.2 KiB
id, title, status, wave, depends_on, plan, spec
| id | title | status | wave | depends_on | plan | spec | |
|---|---|---|---|---|---|---|---|
| 03-e2e-and-verification | Issue indicator E2E and verification | done | 3 |
|
plan.md | ../../specs/tasks/requirements/link-existing-task-github-issue.md |
Task 03: Issue Indicator E2E And Verification
Acceptance
- Desktop Playwright coverage proves linked/unlinked/multiple task states and task navigation.
- Mobile Playwright coverage proves the indicator is reachable by touch and navigates without horizontal layout breakage.
- Formatting, relevant tests, typecheck, and lint pass.
Verification
cd apps/web && pnpm e2e:run tests/github/issue-list-task-indicator.spec.ts
cd apps/web && pnpm e2e:run --no-build --project mobile-chrome tests/github/mobile-issue-list-task-indicator.spec.ts
make fmt && make typecheck test lint
Files Likely Touched
apps/web/e2e/tests/github/issue-list-task-indicator.spec.tsapps/web/e2e/tests/github/mobile-issue-list-task-indicator.spec.tsapps/web/e2e/helpers/api-client.ts
Output Contract
Report desktop/mobile results, full verification commands, files changed, blockers, and follow-up risks; mark this task done in this file and plan.md.