id, title, status, wave, depends_on, plan, spec
| id | title | status | wave | depends_on | plan | spec | |
|---|---|---|---|---|---|---|---|
| 02-quick-terminal-e2e | Prove Quick Terminal across viewports | done | 2 |
|
plan.md | ../../specs/ui/requirements/quick-terminal.md |
Task 02: Prove Quick Terminal across viewports
Acceptance
- Desktop and tablet UI tests prove launcher order, usable hit targets, larger floating-dialog geometry, viewport containment, PTY mount, dismissal, and focus return.
- Pixel 5 coverage proves touch access to a full-height terminal with safe contained geometry, no document horizontal overflow, dismissal, and focus return.
- The existing host-shell integration scenarios still prove command I/O, idempotent start, and clean stop after the shared dialog change.
Verification
From the repository worktree:
cd apps && pnpm install --frozen-lockfile
cd apps/web && pnpm e2e:run tests/terminal/quick-terminal.spec.ts tests/settings/host-shell-pty.spec.ts
cd apps/web && pnpm e2e:run --project mobile-chrome tests/terminal/mobile-quick-terminal.spec.ts
Confirm each managed-runner invocation discovers the intended tests, rebuilds the production Vite assets, and tears down its worker-scoped backend/session state.
Files likely touched
apps/web/e2e/tests/terminal/quick-terminal.spec.tsapps/web/e2e/tests/terminal/mobile-quick-terminal.spec.tsapps/web/e2e/tests/settings/host-shell-pty.spec.ts(only if selector/lifecycle coverage needs a focused update)docs/plans/quick-terminal/plan.md(status/results only)docs/plans/quick-terminal/task-02-quick-terminal-e2e.md(status/results only)
Dependencies
- Task 01 must be done so the provider, launchers, responsive presentation, and stable test IDs exist.
Parallelism
Sequential. These scenarios share the Quick Terminal surface and host-shell lifecycle, and the managed E2E runner owns the same build/test artifact pipeline.
Inputs
- Spec: every
Scenariositem indocs/specs/ui/requirements/quick-terminal.md. - Plan:
E2E Tests,Mobile design contract, andRisksinplan.md. - Existing patterns:
apps/web/e2e/tests/settings/host-shell-pty.spec.ts,apps/web/e2e/tests/chat/mobile-quick-chat-entry.spec.ts, and the animation-aware geometry guidance in.agents/skills/e2e/SKILL.md.
Implementation notes
- Follow E2E TDD: add each focused Playwright scenario and observe its launcher/geometry assertion fail before completing the corresponding production behavior.
- Exercise the feature through visible UI controls. API calls may seed workspace preconditions but must not replace launcher, dialog, dismissal, or focus assertions.
- Wait for finite dialog animations before measuring. Use bounding boxes and
elementFromPoint()for containment/hit-target proof rather than fixed sleeps. - Use
.tap()in the mobile spec and let themobile-chromeproject supply its Pixel 5 device. - Scope terminal locators to the Quick Terminal dialog because other terminal/xterm instances may be mounted elsewhere in the app.
Output contract
Report discovered test counts, exact commands and outcomes, rendered desktop/tablet/phone geometry,
artifact paths on failure, teardown evidence, blockers, residual risks, and the task/plan status
update in this conversation. Set this task to in_progress before test edits, then replace
## Results and mark it done only after every acceptance condition and targeted command passes.
Results
cd apps/web && pnpm exec playwright test --config e2e/playwright.config.ts --project=chromium tests/terminal/quick-terminal.spec.ts— passed; 2 desktop/tablet tests.cd apps/web && pnpm exec playwright test --config e2e/playwright.config.ts --project=mobile-chrome tests/terminal/mobile-quick-terminal.spec.ts— passed; 1 Pixel 5 test.cd apps/web && pnpm e2e:run tests/terminal/quick-terminal.spec.ts tests/settings/host-shell-pty.spec.ts— passed; managed Docker runner rebuilt backend/Vite/plugin assets, ran 4 tests (2 host-shell lifecycle + 2 desktop/tablet UI), and tore down the worker backend.cd apps/web && pnpm e2e:run --project mobile-chrome tests/terminal/mobile-quick-terminal.spec.ts— passed; managed Docker runner rebuilt assets, ran 1 Pixel 5 test, and tore down the worker backend.- Rendered checks covered the 1280px desktop floating surface, 700px tablet floating surface, and Pixel 5 full-height surface; all dialog/terminal bounds remained within the viewport, with zero mobile document horizontal overflow.
- No failure artifacts or residual host-shell sessions remained after the managed runs.