Files
kandev/docs/plans/plugins/task-15-spec-verify.md
2026-08-24 11:09:03 +00:00

2.1 KiB

id, title, status, wave, depends_on, plan
id title status wave depends_on plan
task-15 Spec update + docs + full verification pending 4
task-09
task-13
task-14
docs/plans/plugins/plan.md

Spec update + docs + full verification

Title

Reconcile the spec with what was built, update docs, and run the full format/typecheck/test/lint gate across backend and web.

Inputs

  • Spec docs/specs/plugins/requirements/plugins.md (status: draft).
  • Implemented deltas from this plan.

Acceptance

  1. Spec edits to docs/specs/plugins/requirements/plugins.md:
    • Add the ui.pages[] manifest field (key/title/path/surface) and a new "UI page proxy" subsection under API surface (GET/POST /api/plugins/{id}/ui/*, header stripping for iframe embedding).
    • Narrow "Out of scope → UI extensions": iframe pages are now IN; native JS slots / registry remain OUT.
    • Note tool invocation is implemented as a client + listing endpoint but NOT wired into live agent sessions yet (deferred).
    • Correct the credential-storage line: api_key stored as bcrypt hash; webhook_secret stored encrypted (recoverable) because kandev must HMAC-sign outbound deliveries. Keep "returned once at registration".
    • Keep marketplace / managed-runtime / process-management OUT of scope.
    • Keep status: draft; add a dated note if the spec has a changelog convention.
  2. Update docs/plans/plugins/plan.md task statuses to done.
  3. If a public-docs surface changed, run /docs-maintainer judgment (new operator-facing /api/plugins API + settings page likely warrants a short docs/public/** page — add one if the repo documents other settings pages).

Verification (full gate)

  • make -C apps/backend fmt (FIRST — formatters may split lines)
  • make -C apps/backend typecheck test lint
  • make -C apps/backend build
  • cd apps/web && pnpm run typecheck && pnpm lint && pnpm test
  • cd apps/web && pnpm e2e -g "plugin"

Output contract

Report: spec sections changed, docs added, and the full verification results (paste failing output if any). This task closes the plan.

Dependencies

task-09, task-13, task-14.