1.5 KiB
1.5 KiB
id, title, status, wave, depends_on, plan, spec
| id | title | status | wave | depends_on | plan | spec | |||
|---|---|---|---|---|---|---|---|---|---|
| 04-integrated-mobile-verification | Integrated mobile verification | completed | 3 |
|
plan.md | ../../specs/ui/requirements/mobile-task-navigation.md |
Task 04: Integrated mobile verification
Acceptance
- Fresh production mobile runs cover every spec scenario and no removed-sheet selector remains.
- Desktop Pipeline, Kanban menus, task edit, and workflow filtering regressions pass.
- Format, typecheck, tests, lint, rendered narrow-viewport checks, and public docs complete.
Files likely touched
apps/web/e2e/pages/mobile-kanban-page.tsapps/web/e2e/tests/kanban/mobile-kanban.spec.tsapps/web/e2e/tests/task/mobile-*.spec.tsapps/web/e2e/tests/session/mobile-handoff.spec.tsdocs/public/tasks-and-workflows.md- plan/task status files
Inputs
- Completed Tasks 01–03 and all spec scenarios.
- Mobile parity checks: 44px targets, safe areas, internal vertical scroll, no document x-overflow, focus return.
Verification
Use every command in plan.md → Verification.
Output contract
Report command results, rendered evidence, remaining risks, and mark plan/spec statuses accurately.
Completion
- Full format, typecheck, test, lint, and production web build passed.
- 35 focused mobile browser tests passed.
- 4 desktop Pipeline regression tests passed at a desktop viewport.
- Focused code review, simplification review, and QA audit reported no blockers.