id title status wave depends_on plan requirements acceptance_criteria system_design
06-cancel-reload-regression-e2e Cancel reload regression completed 4
05-backend-owned-cancel-control
plan.md
REQ-UI-CANCEL-TURN-PROGRESS-001
AC-UI-CANCEL-TURN-PROGRESS-001.2
AC-UI-CANCEL-TURN-PROGRESS-001.3
AC-UI-CANCEL-TURN-PROGRESS-001.7
AC-UI-CANCEL-TURN-PROGRESS-001.8
../../specs/ui/system-design/cancel-turn-progress.md

Task 06: Cancel reload regression

Acceptance

  • The desktop regression sends cancellation to the backend during the E2E cancellation-hold mock turn, observes backend cancellation_pending=true, switches tasks, returns, reloads, and sees the same disabled animated control until cancellation settles.
  • A mobile-chrome regression taps cancel, waits for backend-owned pending state, reloads, and observes the same shared-control behavior without relying on desktop-only navigation.
  • The old outbound-request hold helper and assertions are removed; teardown leaves no held frames, stale pending state, or running seeded turn.

Verification

(cd apps && pnpm install --frozen-lockfile)
(cd apps/web && pnpm e2e:run --host --project chromium -- tests/chat/cancel-progress-task-switch.spec.ts)
(cd apps/web && pnpm e2e:run --host --project mobile-chrome -- tests/chat/mobile-cancel-progress-reload.spec.ts)
(cd apps/web && pnpm run typecheck)

Follow TDD: first forward the cancel request and prove the reloaded control loses progress without backend hydration, then enable Tasks 03-05 and make both viewport flows pass. Wait on the exposed backend-derived store field rather than a timeout before reloading.

Files likely touched

  • apps/web/e2e/helpers/session-store.ts
  • apps/web/e2e/helpers/ws-drop.ts
  • apps/web/e2e/tests/chat/cancel-progress-task-switch.spec.ts
  • apps/web/e2e/tests/chat/mobile-cancel-progress-reload.spec.ts

Dependencies

Task 05.

Parallelism

Sequential. This task validates the complete backend-to-hydration-to-control path.

Inputs

  • Spec: task navigation, reload, session-isolation, failure, and compact-mobile scenarios.
  • Plan: E2E Tests and Mobile design contract.
  • Existing patterns: the /e2e:cancel-hold mock-agent command, SessionPage.clickTaskInSidebar, page.reload(), waitForActiveSessionForegroundActivity, and mobile-only spec naming.

Output contract

Report the initial failing reload assertion, final desktop/mobile Playwright counts and durations, seeded-turn settlement/cleanup evidence, exact files/commands, blockers/risks, and synchronize this task plus plan.md in the same primary conversation.

Results

Replaced request-held coverage with backend-accepted task navigation and reload coverage.

  • cd apps/web && pnpm exec playwright test --config e2e/playwright.config.ts --project=chromium e2e/tests/chat/cancel-progress-task-switch.spec.ts — 1 passed (12.1s) after rebuilding the backend binary and Vite assets.
  • cd apps/web && pnpm exec playwright test --config e2e/playwright.config.ts --project=mobile-chrome e2e/tests/chat/mobile-cancel-progress-reload.spec.ts — 1 passed (10.4s).
  • cd apps/web && pnpm run typecheck — passed.
  • git diff --check — passed.

The first desktop attempt exposed that the E2E fixture was launching a stale backend binary; rebuilding apps/backend/bin/kandev and apps/web/dist made the new live event available. The first mobile attempt used the desktop keyboard helper; it was corrected to submit through the mobile button. Both final tests observe backend cancellation_pending=true, verify the disabled spinner after navigation/reload, and wait for the explicit false settle. The old held-frame helper was removed, and each run used only the isolated mock backend/workspace.

The original /slow 30s fixture divided its delay across several emitter boundaries, so a real cancellation could settle before navigation and hydration completed. The /e2e:cancel-hold fixture has one cancellation boundary and emits no assistant output in every mock-agent run. The managed E2E profile supplies a three-second PromptCancelJoinTimeout baseline through AgentctlStartupConfig, the process adapter, and ACP; these two cancel-progress regressions scope a 12-second override, and zero preserves ACP's three-second default for normal startup. Fresh managed Chromium repeats passed five desktop task-switch executions and five mobile reload executions, with the pending control observed before eventual idle settlement.