[KANDEV-W-111] #4722 충-돌-+walkthrough-타-임-아-웃-동시-대응 #175

Closed
opened 2026-10-25 01:32:41 +09:00 by dreampiler · 3 comments
Owner

queue: KANDEV-W-111

목표

W-109-점-검-표-기-준: - #4722- =-충-돌 (DIRTY) + CI-실-패 (pr- walkthrough- generate- =-10분- deadline-타-임-아-웃)- =-하-나-의-자-식-으-로-동-시-대-응 (운-영-규-칙-같-은- PR-한-작-업-묶-음).

진-행

  1. 충-돌-양-측-변-경-파-악→fork-가-지-내-해-소-커-밋.
  2. walkthrough-타-임-아-웃-원-인-조-사 (10분- deadline =-CI-설-정-값? -PR-분-량?) —-CI-설-정-수-정-으-로-해-결-가-능-하-면-fork-가-지-내-수-정-커-밋- (설-정-파-일- =-본-PR-가-지-와-무-관-해-도-CI-설-정- =-仓库-띠-별-확-인-후-판-단-—-애-매-하-면-원-인-근-거-만-기-록-후-보-고).

공-통-경-계

  • RO-점-검+fork-가-지-내-수-정·커-밋-까지 (fork- origin- push- =-승-인-전-금-지-—- push-직-전-별-도-승-인-요-청);-상-류-쓰-기-·댓-글-·thread-0 (5d-단-독);-순-수-단-위·lint·빌-드-최-소-확-인-만 (Windows-프로-세-스형-실-행-금-지);-재-기-동-0.-부-모-93-에-결-과-보-고- (push-승-인-요-청-시-점-+- rebase-필-요-여-부-포-함).
    [근-거-승-인] 운-영- 2026-10-25- 02:2x- 3차. -사-용-자-원-문 (진-단-세-션-경-유- 10-24- 22:3x): -「kandev- 먼-저- 진-행-해-줘」+「상류-에서-승-인-될-내-용-이-라-면...」
queue: KANDEV-W-111 ## 목표 W-109-점-검-표-기-준: - #4722- =-충-돌 (DIRTY) + CI-실-패 (pr- walkthrough- generate- =-10분- deadline-타-임-아-웃)- =-**하-나-의-자-식-으-로-동-시-대-응** (운-영-규-칙-같-은- PR-한-작-업-묶-음). ## 진-행 1. 충-돌-양-측-변-경-파-악→fork-가-지-내-해-소-커-밋. 2. walkthrough-타-임-아-웃-원-인-조-사 (10분- deadline =-CI-설-정-값? -PR-분-량?) —-CI-설-정-수-정-으-로-해-결-가-능-하-면-fork-가-지-내-수-정-커-밋- (설-정-파-일- =-본-PR-가-지-와-무-관-해-도-CI-설-정- =-仓库-띠-별-확-인-후-판-단-—-애-매-하-면-원-인-근-거-만-기-록-후-보-고). ## 공-통-경-계 - RO-점-검+fork-가-지-내-수-정·커-밋-까지 (fork- origin- push- =-승-인-전-금-지-—- push-직-전-별-도-승-인-요-청);-상-류-쓰-기-·댓-글-·thread-0 (5d-단-독);-순-수-단-위·lint·빌-드-최-소-확-인-만 (Windows-프로-세-스형-실-행-금-지);-재-기-동-0.-부-모-93-에-결-과-보-고- (push-승-인-요-청-시-점-+- rebase-필-요-여-부-포-함). [근-거-승-인] 운-영- 2026-10-25- 02:2x- 3차. -사-용-자-원-문 (진-단-세-션-경-유- 10-24- 22:3x): -「kandev- 먼-저- 진-행-해-줘」+「상류-에서-승-인-될-내-용-이-라-면...」
Author
Owner

W-111 CM 원미완 재판정: 원task3f0179e2-1b98-4b7b-9d8e-bb52c4957c29/원SID9de01f80-ac73-42b1-9d6f-7016062194c4 보존. 원flowcreatedr2/p320r1/결속누락을 ensure CALL-20261025-0b0f96346439로동일task bound, 새task0. 원결과2c0412ae54a6513c990310e58a6e798f/956677de26bf66fee0eeb2b83e4dd0d6 및 tool d57500a795521514bd8014aa0baf1a00의30contractPASS0.011s/당시clean을직접확인했다. 9af2a2a7138은native-main위600→630초후보이지#4722충돌해소결과가아니다. 공식#4722 OPEN/unmerged, fork원head8e3d93c942db7f08ab0da88de948b81ac40d5ea7/basec15867d270e3cddcae5334262ba5b31a6ef9ecce/10파일, mergeable=null/unknown으로현재충돌여부미확정. 기존W113의900초/16분/30분/정식RV·fork355통합을재사용하고옛630초후보는보존하되push/별도PR/퇴행0. 원taskPlan e6ca86ea와description끝에정확원head·W113소비·정상계보확인·원범위검증/RV·93/5d담당을갱신, 완료→대기 move applied entry20538. 정상WIP/pull로원미완몫만잇고실도구/수정/검토PASS/flowclose는아직주장하지않는다. 과거4000commit전체rebase/일괄theirs/allow-unrelated/force/reset/새task·사본·worker·운영변경0. 기존상류사전승인과전담유지,낡은push승인대기를새차단으로복원0. 원result/수신acceptance가갖춰진범위만정식종결한다.

W-111 CM 원미완 재판정: 원task3f0179e2-1b98-4b7b-9d8e-bb52c4957c29/원SID9de01f80-ac73-42b1-9d6f-7016062194c4 보존. 원flowcreatedr2/p320r1/결속누락을 ensure CALL-20261025-0b0f96346439로동일task bound, 새task0. 원결과2c0412ae54a6513c990310e58a6e798f/956677de26bf66fee0eeb2b83e4dd0d6 및 tool d57500a795521514bd8014aa0baf1a00의30contractPASS0.011s/당시clean을직접확인했다. 9af2a2a7138은native-main위600→630초후보이지#4722충돌해소결과가아니다. 공식#4722 OPEN/unmerged, fork원head8e3d93c942db7f08ab0da88de948b81ac40d5ea7/basec15867d270e3cddcae5334262ba5b31a6ef9ecce/10파일, mergeable=null/unknown으로현재충돌여부미확정. 기존W113의900초/16분/30분/정식RV·fork355통합을재사용하고옛630초후보는보존하되push/별도PR/퇴행0. 원taskPlan e6ca86ea와description끝에정확원head·W113소비·정상계보확인·원범위검증/RV·93/5d담당을갱신, 완료→대기 move applied entry20538. 정상WIP/pull로원미완몫만잇고실도구/수정/검토PASS/flowclose는아직주장하지않는다. 과거4000commit전체rebase/일괄theirs/allow-unrelated/force/reset/새task·사본·worker·운영변경0. 기존상류사전승인과전담유지,낡은push승인대기를새차단으로복원0. 원result/수신acceptance가갖춰진범위만정식종결한다.
Author
Owner

W-111 acceptance: Official PR #4722 merged on 2026-10-28 at head f3d0895f6dd9a23e103c45ac99efbc80be815a21 as merge 013711aa0a439eb32d5b5613efdadbace0cd6564. The final-head walkthrough generate, publish, link, and reconcile checks succeeded. This satisfies only the W-111 original conflict and walkthrough target. W-113 timeout work, the 630-second local candidate, skipped frontend test jobs, the action-required preview, and remaining retained-checkout work stay separate. No code, test, rerun, or operating change was made.

W-111 acceptance: Official PR #4722 merged on 2026-10-28 at head f3d0895f6dd9a23e103c45ac99efbc80be815a21 as merge 013711aa0a439eb32d5b5613efdadbace0cd6564. The final-head walkthrough generate, publish, link, and reconcile checks succeeded. This satisfies only the W-111 original conflict and walkthrough target. W-113 timeout work, the 630-second local candidate, skipped frontend test jobs, the action-required preview, and remaining retained-checkout work stay separate. No code, test, rerun, or operating change was made.
Author
Owner

Workflow complete. All steps accepted and advanced.

Workflow complete. All steps accepted and advanced.
Sign in to join this conversation.
No Label
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: dreampiler/kandev#175